Licensed, Bonded & Insured | Family Owned & Operated
049-012803 IL | IL Pumping License: 054-021753 | IA Pumping License: 12839

If you’re reading this, you likely just bought property without city sewer, your current system is failing, or your home plans need a septic design to move forward. You’re juggling budgets, timelines, county rules, and a yard you don’t want torn to pieces. You might feel uneasy—like there are “gotchas” hiding in the fine print. We get it. At Triple D Excavating Co. in Orion, IL, we help homeowners across Rock Island, Henry, Knox, Mercer, and Muscatine Counties plan and install septic systems that fit both the land and the budget. This guide breaks down real costs, common surprises, and smart ways to save without risking the health of your home or property.

Every property is different, but most full installs in our region fall into ranges like these (for planning only):
Conventional gravity systems: often $$–$$$ range depending on soil, setbacks, and access
Pump or pressure systems: add costs for pumps, controls, and electrical
Mound or ATU/drip systems: higher due to media, components, and more complex designs
Those ranges are wide because the ground under your feet decides a lot. Soil type, water table, slope, and space all drive design and price. Local rules in Rock Island and nearby counties also shape the plan. The rest of this guide shows how each factor can nudge your number up or down—and what to do about it.
Soil testing (perc tests and borings) is your first gate. Sandy loams drain faster and can support simpler systems. Tight clays, shallow bedrock, or a high water table push you toward pressure, mound, or advanced treatment.
Slope affects excavation, trenching, and how we manage runoff. Steeper slopes often mean more earthwork and stabilization.
Setbacks to wells, property lines, streams, and buildings limit where the system can go, which can increase trench lengths or lead to different system types.
Space matters. Tight in-town lots often require creative layouts, low-impact equipment, or specialty systems.
Tip: Budget for the site evaluation up front. A clear read on your soil and layout is the best way to avoid budget whiplash later.
Each county has its own process, fees, and inspection steps. While the steps are similar—application, design approval, installation, final inspection—the timing and paperwork can vary. Design must follow state code and local health department rules, including soil loading rates and trench sizing. Plan for:
Permit fees (county-dependent)
Design fees (licensed designer or engineer)
Inspections (usually at key stages)
We handle the coordination and keep you posted on required steps and timing so your project doesn’t stall.
Conventional Gravity: Uses natural slope and soil to filter wastewater. Lower upfront cost when soil and space cooperate.
Pressure/Low-Pressure Pipe (LPP): A pump doses effluent evenly. Great for borderline soils or when a gravity layout won’t meet setbacks.
Mound Systems: Build a raised sand/soil bed to create the right treatment zone above high water tables or shallow soils. Higher cost due to materials and build steps.
ATU (Aerobic Treatment Unit): Adds oxygen to speed breakdown, producing cleaner effluent. Helpful on tight sites or sensitive areas; adds mechanical parts and maintenance.
Drip Systems: Precisely dose soil using tubing. Useful on slopes, wooded lots, or irregular spaces; higher install complexity and controls.
We select the type that fits your soil, setbacks, and long-term needs—not the other way around.
Concrete: Heavy, stable, and durable. Less likely to float in high water tables. Requires proper sealing and high-quality lids.
Poly (Plastic): Light and rust-proof. Easier to place on tight or soft sites but needs correct bedding and anchoring in high water.
Fiberglass: Strong and light. Good corrosion resistance. Similar anchoring concerns to poly in wet areas.
We’ll match tank material to your site conditions and access limits to protect both the budget and the system.
Design and soil testing beyond the basic perc (borings, lab work)
Electrical work for pumps and alarms (dedicated circuits, trenching)
Access improvements (temporary road mats, gravel, grading)
Rock excavation or unexpected obstructions (tree roots, old foundations)
Dewatering in high water table conditions
Property restoration (topsoil, seed, sod, driveway patches, fence resets)
Change orders when design differs from what the first shovel reveals
Set aside a 10–15% contingency if your soil is unknown, space is tight, or water is high.
Getting equipment and materials to the work zone is half the battle. Tight gates, long soft yards, buried dog fences, decorative walls—these all add time and care. After the install, you may need:
Lawn rehab: topsoil, seed or sod, straw
Driveway fixes: gravel, compacting, asphalt or concrete patching
Tree/landscape care: root protection, replanting
Fence and hardscape resets
We plan access routes to minimize damage and give you a restoration menu before work begins.
Pump or ATU systems need safe, code-compliant power. Budget for:
Electrician time (new circuit, GFCI protection where required)
Control panel with high-water alarm
Trenching for conduit runs, proper depth, and call-before-you-dig locates
Cutting corners on power is a fast way to shorten system life. Do it right once.
In our region, spring thaws and heavy rains can saturate soils. Wet ground is harder to work and easier to damage, and it can trigger dewatering steps. Dry stretches—often late summer into fall—can be ideal for access and restoration. That said, we install year-round, timing earthwork and restoration to protect your yard and the system.
Week 1: Discovery & Design
Site visit, soil review, layout talk, utility locates.
Preliminary design and estimate with options.
Week 2–3: Permits & Scheduling
Submit design, secure permits, set inspection windows.
Order tank and materials based on the approved plan.
Week 4: Ground Work Begins
Access prep, excavation, tank set, trenching or bed build.
Pipe, chambers, or drip lines installed per design.
Week 5: Power, Backfill & Rough Grade
Electrician ties in power and controls.
Backfill in lifts, compact, and rough grade the yard.
Week 6: Inspection, Final Grade & Restoration
County inspection.
Final grading, seed/sod, driveway touch-ups, fence resets.
Walkthrough, as-builts, warranty details.
(Some projects finish faster; complex sites take longer. We keep you updated daily.)
When comparing quotes, make sure each includes:
System type and size (tank volume, trench/bed square footage)
Materials list (tank material, chambers/pipe, sand/media)
Electrical scope (panel, alarms, trenching, electrician included or excluded)
Restoration (topsoil, seed/sod, hardscape repairs, driveway fixes)
Permits and inspections (who pulls/coordinates)
Rock clause or unforeseen conditions (how are extras priced?)
Timeline and payment schedule
Warranty (components and workmanship)
If a bid looks much lower, check what’s missing before you celebrate.
Place the system for easier access now and later. Future service costs drop when lids and components are reachable.
Choose durable lids and risers. Saves money on service calls and avoids digging.
Right-size the system for the home. Oversizing can cost more now; undersizing costs more later.
Plan restoration choices. Seed instead of sod in low-traffic areas; keep sod for high-visibility spots.
Tackle drainage issues while we’re on site. Simple swales or downspout changes protect your field.
We schedule inspections with your county, walk the system with the inspector, and handle any small adjustments on the spot. Once approved, you’ll get as-built documentation, control panel basics, and a maintenance plan. We explain what to flush (and what not to), pumping intervals, alarm behavior, and when to call.
Plan for:
Pumping every 2–4 years (household size and usage matter).
Annual checkups for pump/ATU systems (filters, floats, panel tests).
A small emergency fund for unexpected repairs—especially for sites with high water or heavy roots.
A little routine care can add many years to your drain field.
Flat Rural Lot (sandy loam, room to work):
Likely a conventional or simple pressure system.
Fewer access limits and easier restoration.
Savings come from straightforward excavation and shorter timelines.
Wooded Lot (mixed soils, tree protection):
More time for clearing and careful root work.
Possible pressure or mound design if soils are tight.
Restoration includes replanting and erosion control.
Tight In-Town Lot (setback puzzles):
Space challenges may push toward low-profile beds, drip, or ATU.
Access may require smaller equipment and hand work.
Restoration covers fences, driveways, and close neighbors—more labor, more detail.
These examples show how site realities steer both design and dollars.
No soil data, but a “fixed” price. That’s guesswork.
Vague scope. If it’s not in writing, it’s not included.
No permit handling. You’ll be the one stuck in the middle.
Rock or water surprises with no plan. You need a clear pricing path for unknowns.
Weak restoration plan. Your yard shouldn’t look like a construction site for months.
Pick the team that shows you the plan, not just the price.
We’re builders and neighbors here. Our focus is simple: match the system to the land, protect your budget, and leave your property clean and serviceable. We don’t do drama. We keep you informed with plain talk, daily updates, and clear next steps. Our crews work across Rock Island, Henry, Knox, Mercer, and Muscatine Counties, so we understand local soils, access quirks, and inspection styles. That local knowledge helps us avoid missteps that waste time and money.
What did the soil tests show, and how does that change the design?
Where will the tank and field go, and how will equipment reach it?
What’s the full materials list—tank size, pipe/chambers, media?
Who handles permits, inspections, and utility locates?
What’s included in restoration (topsoil, seed/sod, driveway, fences)?
What’s your plan if we hit rock or water? How are extras priced?
What electrical work is needed, and is a licensed electrician included?
What are the warranties on parts and workmanship?
What’s the realistic timeline, and how will you protect the yard if it rains?
How do I care for this system after install—pumping, alarms, filter cleaning?
If you get clear, confident answers, you’re on the right track.
The “real cost” of septic installation isn’t only the check you write on install day. It’s the years of reliable service that follow. Good soil data, a solid design, and clean access can save you thousands over the life of the system. Hidden costs shrink when you plan for power, restoration, and weather from the start.
Ready to price your project the smart way? Triple D Excavating Co. will evaluate your site, walk you through options, and build a detailed, apples-to-apples scope so you can choose with confidence. We’re based in Orion, IL and serve Rock Island, Henry, Knox, Mercer, and Muscatine Counties. Let’s design a system that fits your land—and your budget—without the surprises.

AVOID COSTLY MISTAKES:
Do NOT hire an excavating contractor without first reading our free guide:
The ULTIMATE Excavation & Septic "Success Guide."

All rights reserved | Privacy policy